The Straightforward Off-Mains Conversion
When replacing an existing oil or LPG boiler, the process is generally more direct. We'll size the new heat pump unit, typically sited outside on a hard standing, and connect it to your existing pipework. The old oil tank or LPG cylinders are removed, reclaiming valuable garden space. Internally, a new hot water cylinder and often a buffer tank are installed, requiring space usually in an airing cupboard or utility room. This phase typically takes 3-4 days, involving disruption to heating and hot water for parts of this period. We manage the disconnection and removal of your old system alongside the new installation to minimise inconvenience.
- External heat pump unit siting and connection
- Oil tank/LPG cylinder removal and disposal
- Internal hot water cylinder and buffer tank installation
- Integration with existing central heating pipework