On-Site Diagnosis and Thawing
Once on site, my first step is to confirm the frozen condensate pipe. This involves tracing the pipe's external run and visually inspecting for blockages or ice. Often, a gentle gurgle or a specific fault code on your boiler display can indicate this issue. I'll use warm water to carefully thaw the pipe, allowing the condensate to drain. This typically gets your boiler operational again within the same visit. I'll then restart and monitor the boiler to ensure normal operation and verify the condensate flow. The goal here is immediate restoration of heating and hot water.
- Tracing the external condensate pipe run
- Visual inspection for ice blockages
- Careful thawing using warm water
- Boiler restart and flow verification

